GTT obtains tank design order for a new LNG Carrier from Samsung Heavy Industries

2021-12-22

Paris – December 22nd, 2021. GTT announces that it has received an order from its partner the Korean shipyard Samsung Heavy Industries for the tank design of a new LNGC[1].

As part of this order, GTT will design the tanks of the vessel which will offer a capacity of 180,000 m3. The LNGC tanks will be fitted with the GTT Mark III Flex membrane containment system.

The vessel will be delivered during the second quarter of 2024.

Media contact: 
press@gtt.fr / +33 (0)6 31 62 23 48

Investor Relations contact: 
information-financiere@gtt.fr / + 33 (0)1 30 23 20 87

Download in .pdf

 

[1] Liquefied Natural Gas Carrier