GTT receives an order from HD KSOE for the tank design of 6 LNG-fuelled container ships
2025-07-01
Paris, 1 July 2025 - GTT announces it has received, during the second quarter of 2025, an order from HD Korea Shipbuilding & Offshore Engineering (HD KSOE)[1] for the design of the cryogenic tanks of six new LNG[2]-fuelled container ships, on behalf of the ship-owner Capital.
Each vessel will be equipped with a tank offering a capacity of 8,000 m³, incorporating GTT’s Mark III Flex membrane containment system. These tanks will also feature the “1 barg”[3] design, allowing an operational pressure of up to 1 barg, significantly higher than the current industry standard of 0.7 barg. This enhanced design increases LNG holding time and facilitates compliance with upcoming regulatory requirements related to cold ironing (shore-power connection during port calls).
The use of liquefied natural gas for propulsion offers a concrete response to evolving environmental regulations, achieving substantial reductions in nitrogen oxides (NOₓ), sulphur oxides (SOₓ), carbon dioxide (CO₂) and ultrafine particles. Compared to conventional heavy fuel oil, this state-of-the-art solution can prevent the emission of nearly 25,000 tonnes of CO₂ annually per vessel.
Delivery of the six vessels is scheduled between the second quarter of 2027 and the first quarter of 2028.
Media contact: press@gtt.fr / +33 (0)1 30 23 20 43
Investor relations contact: information-financiere@gtt.fr / + 33 (0)1 30 23 20 87